52古典>英语词典>head gate翻译和用法

head gate

英 [hed ɡeɪt]

美 [hed ɡeɪt]

首部闸门

英英释义

noun

  • a gate upstream from a lock or canal that is used to control the flow of water at the upper end
    1. regulator consisting of a valve or gate that controls the rate of water flow through a sluice
        Synonym:sluicegatesluice valvefloodgatepenstockwater gate

      双语例句

      • Study on model test for a large scale prestressed pier of a flood releasing and scouring sluice head gate structure [ irrigation]
        大型泄洪排沙闸预应力闸墩结构模型试验研究渠首闸门,总水闸门[灌溉]
      • Factors such as head, diameter of penstock of Xiaolangdi hydropower plant and the much sediment in Yellow River exclude the use of butterfly valve and ball valve at the intake of the power plant, so a special intake valve-ring gate was adopted in the project.
        小浪底水电厂的水头、压力钢管直径以及黄河多泥沙的特点,决定了其机组的进水主阀不适宜采用蝴蝶阀和球阀,为此采用了一种特殊的进水阀&筒型阀。
      • Research on the sealing type of high water head radial gate
        高水头弧形闸门止水型式研究
      • Design of Pneumatic Gauge Head for Valve Body's Taper of Wedged Odd Gate Valve
        楔式单闸板阀门阀体锥度气动测头的设计带卡瓦的闸板式防喷器
      • The layout of upper head with lowering working gate of Three Gorges ship lift is studied.
        对三峡升船机上闸首下沉式工作闸门布置进行研究。
      • Irrigate with water from a sluice. head gate structure [ irrigation]
        渠首闸门,总水闸门[灌溉]
      • Research on Flow-Induced Vibration of Low Head Hydraulic Tainter Gate
        低水头水工钢结构弧形闸门流激振动研究
      • Engineering design characteristics of Shiqiao third-lane lock on Beijing-Hangzhou Canal head gate structure [ irrigation]
        京杭运河施桥三线船闸工程设计特点渠首闸门,总水闸门[灌溉]
      • The gate length and the dimension of the gate head can be controlled in the T-shaped gate processing, and good process controllability and high yield can be achieved.
        在该T型栅工艺中栅长和栅帽的尺寸分别进行控制,实现了较好的工艺可控性和较高的工艺成品率。
      • The maximum operation head of spillway tunnels is 120m, two orifices of water gate combine to be a hole in the spillway tunnels, the problem of discharge and energy dissipation is very complex;
        泄洪隧洞工作水头达120m,采用双孔合一的闸门布置形式,高水头大流量的泄洪消能问题十分突出;